Part 1

1.What kind of masonry have you done, and what was the last job you worked on?

Why they ask

Block, face brick, stone veneer and restoration are different skills. The foreman needs to know where to put you on the wall.

How to answer

  • Name the material first: CMU, face brick, veneer, or a mix
  • Describe the last project in a sentence, such as a school addition or a strip mall
  • Say what part you did: laying to the line, building leads, or tending
  • Be honest about what you haven't done yet

2.Walk me through how you build a lead or a corner.

Why they ask

Building leads is where the wall's accuracy starts. Someone who can do it well is worth more than someone who can only run the line.

How to answer

  • Check the layout and the first course against the prints
  • Set the corner block or brick, then rack back as you go up
  • Check plumb, level and the story pole or course spacing as you build
  • Mention the tools: level, story pole, square

3.How do you know when the mortar on your board is getting too stiff to use?

Why they ask

Using mortar that has started to set leads to weak joints and walls that fail inspection. It's a quick way to tell if you understand the material.

How to answer

  • Describe how it looks and feels when it starts to stiffen
  • Explain retempering with a little water early on, if the spec allows
  • Say you toss mortar that's past its working time instead of forcing it
  • Mention that hot, windy days shorten the window
4.How do you handle laying brick or block in cold or very hot weather?

Why they ask

Weather changes how mortar cures. Contractors need people who protect the work instead of leaving it to freeze or bake.

How to answer

  • Cold: covering the wall, tenting and heat, keeping materials dry
  • Heat: wetting the brick when the spec calls for it, working smaller batches
  • Following the foreman's plan and the project specs
  • Knowing when to stop and tell someone conditions aren't right
5.Can you read a set of blueprints and find the wall details you need?

Why they ask

Openings, lintels, control joints and bond patterns all come off the drawings. A bricklayer who can read prints needs less supervision.

How to answer

  • Say honestly how comfortable you are with prints
  • Name what you look for: elevations, wall sections, openings, flashing details
  • Give an example of catching a problem from the drawings
  • Say you ask before guessing on something unclear

Part 2

6.What goes into a block wall besides the block?

Why they ask

Rebar, grout, joint reinforcement, ties and flashing are what make a wall pass inspection. This checks whether you understand the whole system.

How to answer

  • Vertical rebar and grouted cells where the plans call for them
  • Horizontal joint reinforcement at the spacing the specs require
  • Wall ties to the backup and through-wall flashing with weeps
  • Cleanouts so the grout can be checked
7.How do you stay safe on scaffold, and what would you do if you saw a plank that looked wrong?

Why they ask

Falls are the biggest danger on a masonry job. The foreman wants someone who speaks up, not someone who steps around a problem.

How to answer

  • Mention guardrails, tie-ins, full planking and not overloading the deck
  • Say you'd stop, tell the foreman, and not use it until it's fixed
  • Mention any safety card or scaffold training you have
  • Give a real example if you have one
8.How many block or brick do you lay in a day?

Why they ask

They're checking whether you know your own pace and whether you'll be straight with them. They'll see the real answer during the trial anyway.

How to answer

  • Give an honest range for the type of unit and wall you usually lay
  • Explain what slows you down or speeds you up, like cuts and openings
  • Say quality comes before speed, but you know the crew has a pace to keep
  • Offer to show them on a trial day
9.Tell me about a time you had to tear out and relay work.

Why they ask

Everyone makes mistakes on a wall. The foreman wants to know you own them and fix them instead of hiding them behind the next course.

How to answer

  • Describe what was wrong, such as a course out of level or a bad bond
  • Say how you noticed it or who pointed it out
  • Explain how you fixed it and what you do differently now
  • Keep it short and don't blame the tender or the weather
10.What tools do you bring to the job?

Why they ask

Bricklayers are expected to own their hand tools. Having them and keeping them in good shape says you're serious.

How to answer

  • Trowels, levels, jointers, line blocks or pins, and a brick hammer
  • A tape, a square, and a story pole if you use one
  • Your own safety gear: boots, glasses, gloves
  • Say which power tools you're comfortable using, like a masonry saw

Part 3

11.How do you get along with tenders and other bricklayers on the crew?

Why they ask

A masonry crew only moves as fast as its weakest link. Someone who fights with the tenders slows the whole wall down.

How to answer

  • Say you tell your tender clearly what you need before you run out
  • Mention helping out when your section is ahead
  • Show respect for the tenders, since you may have been one
  • Give an example of working through a disagreement on the wall
12.Can you travel to different sites, and are you okay with early starts and weather days?

Why they ask

Masonry jobs move around and start early. Days get lost to rain, and the foreman needs people who'll stick with it.

How to answer

  • Confirm you have reliable transportation and a valid license if you do
  • Say plainly how far you're willing to drive
  • Say you understand weather days and plan for them
  • Mention that you show up on time, and mean it

Questions to ask them

Ask at least two. It shows you're picking them too.

  • What kind of work is the crew on right now: block, face brick, veneer, or restoration?
  • Will I be laying to the line from the start, or tending for a while first?
  • How does the company handle rain days and the slower months?
  • Who would I be working under, and how many tenders support each bricklayer?
  • Is there a path to running a crew or moving into layout work?