Bricklayer skills: what to learn first, and what can wait

A foreman can tell within a few minutes on the wall whether you know what you're doing. Nobody reads a list of skills on a masonry crew. They watch your trowel, your line and your joints, so learn the skills below in order and you'll pass that first look.

1 open jobs
Step one

Gets you the interview

Laying to the lineSetting line blocks or pins, pulling the line tight, adding a trig in the middle of a long run, and keeping each unit a hair off the string without touching it. It's the first thing you'll be asked to do, and crooked coursing gets spotted from the ground.
Reading mortar on the boardKnowing when mud is too wet to hold a head joint, when it's stiffening, and when to retemper versus throw it out. Tenders mix it, but you're the one who decides it's usable, and bad calls show up as smeared face brick.
Plumb, level and true with a mason's levelChecking your work every few courses instead of eyeballing it. Contractors care more about a wall that doesn't need tearing out than a fast one that does.
Striking joints at the right momentConcave, V and raked joints each need a different jointer, and timing is the whole trick. Tool too early and you drag mortar, too late and you get a crumbly, dull joint the inspector notices.
Step two

Gets you the offer

Story poles and the mason's ruleReading brick spacing on a modular rule so your coursing lands exactly at window sills and lintel heights. A bricklayer who can set up a story pole without asking saves the foreman a morning.
Reinforced CMU workPlacing vertical rebar, setting bond beam units, leaving cleanouts, and knowing when a wall is ready for its grout lift. Commercial block jobs run on this, and plenty of brick-only layers have never done it.
Cavity wall detailsSetting wall ties at the right spacing, lapping and sealing through-wall flashing, keeping the air space clear of droppings and leaving weeps open. Leaky veneer comes back as a warranty call, so foremen trust the people who get this right.
Cutting clean and dust-safeScoring with a brick hammer and bolster for rough cuts, running a wet masonry saw for exposed ones, and following the silica rules your site uses. Good cuts at corners and openings are where a wall looks finished or amateur.
Step three

Gets you promoted

Layout straight from the printsFinding wall types, control joint locations, opening sizes and lintel callouts on the drawings, then snapping lines on the slab before anyone lays a unit. This is the jump from laying walls to deciding where they go.
Material takeoffsCounting brick, block, mortar, ties and grout from a set of plans, with a sensible waste allowance. Foremen who order right keep the crew laying instead of waiting on a truck, and it's the first step toward estimating.
Pacing a section with tendersTelling tenders what to stock and when, raising scaffold before the crew runs out of reach, and splitting leads among the layers. A crew that never stands around is the thing superintendents remember.
Restoration and tuckpointingGrinding out failed joints, matching old mortar with lime-based mixes, and replacing spalled units so the patch disappears. Older buildings need this work in every season, and fewer bricklayers can do it well.

Certificates worth your time

CertificateBest forEffortWorth it?
OSHA 10-Hour ConstructionNew bricklayers and tenders heading onto commercial sitesA couple of days of class, in person or onlineGet it before you start applying. Lots of general contractors won't badge you onto the site without a card.
OSHA 30-Hour ConstructionExperienced layers aiming at lead hand or foremanAbout a week of class, often spread over several eveningsWorth it once you're running people, since supervisors are often expected to hold it. Not needed to get your first job.
NCCER Masonry credentialsOpen shop apprentices and trade school studentsBuilt up level by level over a few years of trainingUseful proof of training if you didn't come through a union program. Contractors still judge you on the wall, so treat it as a bonus.

Card requirements, scaffold training and any contractor licensing differ by state and by site, so check the course provider, your local training center or your state board before you pay for anything.

Put it on your résumé like this

Weak

Did bricklaying and block work on commercial jobs.

Strong

Laid 12-inch reinforced CMU with bond beams and grout lifts on a 4-story school addition, and set story poles and corners for a 5-mason crew with zero rework at inspection.

Questions people ask

Should I learn brick or block first?

Block, if you're after commercial work. It's heavier, but it's more forgiving on joints and it's where most new layers get their first steady trowel time. Face brick comes once a foreman trusts your line and your jointing.

What bricklayer skill do new people struggle with most?

Reading the mortar. Getting units on the line is teachable in weeks, while judging mud as the sun and wind change it takes a lot of time on the board. Ask the older layers why they're tempering, and pay attention.

Do I need to know how to read blueprints to get hired?

Not as a new layer, because the foreman or lead hand does the layout. You'll want it before you ask for more responsibility, since every promotion on a masonry crew starts with someone trusting you to read the drawings.

Is restoration work a good specialty?

It's a solid one if you like slower, fussier work. Restoration crews tend to prize patience and mortar matching over raw speed, and some layers find it easier on their body than production block.

Got step one? Start applying. HeroApply matches you to roles that fit.

Start your trial