1.Walk me through unloading and shaking out a truck of steel for a metal building.
Why they ask
Shake-out sets up the whole job. A bad one means digging a rafter out from under a pile of purlins while the crane sits idle.
How to answer
- Check the bill of lading and the piece marks against the erection drawings as the load comes off
- Set dunnage so pieces sit off the dirt and can be choked easily later
- Lay steel out near where it goes up, columns by their lines, rafters in erection order
- Keep bolts, clips and hardware together and covered
- Flag shorted or damaged pieces to the foreman right away