1.Walk me through how you'd sample a groundwater monitoring well using low-flow methods.
Why they ask
This is the core task at most consulting firms. They want to hear the steps in the right order, which shows you've done it or studied it properly.
How to answer
- Gauge the well first with an interface probe and record depth to water
- Set the pump intake in the screened interval and purge at a slow rate to keep drawdown small
- Watch pH, conductivity, dissolved oxygen, turbidity and temperature in a flow-through cell until they stabilize
- Fill bottles in the order the plan says, volatiles first, with no headspace in the vials
- Label, bag, ice and record everything on the field sheet

