1.Walk me through how you'd set up the doors at the start of a shift.
Why they ask
Door planning is the core of the job. They want to see you think about appointments, drop trailers and labor together rather than reacting all shift.
How to answer
- Start with the appointment schedule and the yard check: what's live, what's dropped, what's late
- Match doors to freight type, keeping heavy or floor-loaded inbound near the right staging space
- Hold one door flexible for the load that always shows up unannounced
- Line up the crew against the plan and move people before the first truck backs in

