1.Walk me through how you set up a new job on a vertical mill, from the old job coming off to the first part.
Why they ask
This is the core of the role. They want to hear a real sequence, not a list of words, and they're listening for whether you verify before you cut.
How to answer
- Pull the setup sheet, print, and program first, and stage the tools and fixture before the last job finishes
- Clean the table, mount and indicate the vise or fixture, and set the work offset with an edge finder or probe
- Load tools, measure lengths with the presetter or tool setter, and check the offset page against the tool list
- Prove out with single block, rapid override down, and distance-to-go watched on every approach
- Run the first part, inspect it or send it for first article, adjust wear offsets, then hand it to the operator