1.Walk me through how you set up on a residential job you've never seen before.
Why they ask
This is the whole job in one question. They want to hear a real order of checks, not a vague promise to be careful.
How to answer
- Look up before you park: power lines, tree limbs, the eave of the house
- Check the ground for soft fill, septic tanks, sprinkler lines and fresh backfill near the foundation
- Pick a spot that keeps the pick inside the chart at the radius you need, then set outriggers fully on cribbing or pads
- Level the truck, set up the swing area barricade or cones, and confirm who's signaling
- Do a test lift a few inches off the deck before committing the load

