Most of a deck is buried or hidden, and that's the part you'll spend your hardest hours on. You dig the footings, bolt the ledger to the house, and frame a floor that has to stay flat and solid for a long time. The boards people actually see go on last, and they go on fast.
You're building a structure that sits outside, gets rained on, and hangs off the side of someone's home. That changes the work. A framer inside a house can lean on the building around them, but a deck has to stand on its own posts and resist sway without walls to brace it. The connection to the house is where decks fail, so you'll learn flashing and ledger attachment better than almost anyone on a residential crew. Crews tend to be small. You might be on a crew of just you, a lead carpenter, and the owner, which means you touch every stage instead of doing one task all week. The work is also seasonal in colder places. Spring and summer can be packed, and winter can go quiet or turn into interior finish work for the same company.
You meet the lead at the shop, load pressure-treated posts, joist hangers, carriage bolts, and the day's composite boards. Somebody reads through the permit drawing one more time, because the inspector will hold you to the beam size and post spacing on that sheet.
Joists go in at the layout marks, each one crowned up, nailed into hangers with the right structural nails. You run a string line across the tops and plane or shim anything that's high. A wavy frame means a wavy deck forever, so this part is slow on purpose.
The framing inspection was booked for the afternoon, but the inspector is in the neighborhood now. You stop, pull tools off the frame, and walk the inspector through the ledger flashing and the lateral load hardware. A missing hanger nail gets called out. You fix it on the spot and get the sign-off, but the morning's plan is gone.
You roll butyl tape over the tops of the joists, then start decking from the house outward. Composite boards from brands like Trex or TimberTech get hidden clip fasteners and a gap you check with a spacer, not your eye. The first board sets the line for every one after it, so the lead usually snaps that one.
You sweep the offcuts, stack the scraps the client asked to keep, and cover the lumber pile. The lead writes a cut list for the stairs and railing posts. You'll check the batteries on the impact drivers before you leave, because a dead battery at seven in the morning costs everyone.
This is the usual way in. You carry lumber, dig post holes, and fetch hardware at first. Show up on time with your own basic tools, a tape, a speed square, a hammer, and a utility knife, and you'll be handed a nail gun sooner than you'd think.
If you already frame houses, you know layout and you know how to read a plan. What you'll have to learn is outdoor detailing: flashing the ledger, sizing footings for your frost line, and installing composite and PVC boards the way the manufacturer's warranty demands.
A carpentry program at a community college or a union apprenticeship teaches you framing, code basics, and safety. Deck work is a narrow slice of that, but the training makes you trusted faster and gives you a route back to broader carpentry when the season slows.
Most deck builders work under someone else's license at first. If you go out on your own, many states and cities want a contractor or home improvement license, proof of insurance, and sometimes a bond. Rules vary by state and even by town, so check with your state's contractor licensing board and your local building department before you take a paying job. Nearly every deck that's attached to a house or raised off the ground needs a permit, and the builder who knows the local code gets fewer failed inspections. That's the skill that turns a good carpenter into someone homeowners will trust with their money.
0% of openings are fully remote.
For a helper spot, bring hand tools: a tape measure, speed square, hammer, pencil, chalk line, and utility knife, plus good boots and gloves. The company usually supplies the post hole auger, miter saw, framing nailer, and track saw. As you move up, crews expect you to own your own impact driver and drill set.
Yes, and it's honest to say so. Digging footings, carrying wet lumber, and kneeling to fasten boards add up. Knee pads, a good back routine, and learning to let the auger and the dolly do the heavy work make a real difference over a career.
It depends on where you live. In warm regions the work runs all year. Where the ground freezes, digging footings gets hard, and many crews switch to basements, porches, or interior trim until spring, so ask how the company keeps people busy in the off season.
HeroApply applies to them for you, so you can keep doing the job you have.